Construction Crane Close Up
The huge crane used to build the parking garage behind Bldg. 60 (the Cloister) was dismantled on Apr. 20.
In a couple of these photos, you can see two little figures high up on the large crane, unbolting the sections, and the segments being lifted down by a smaller crane.